ALANYA AUTHORIZED ENGINEERING & SERVICE CENTER

Service & Engineering Solutions

MV/HV transformer substations, 24/7 fault repair and oil maintenance, turnkey Solar Power Plants (SPP), and power transmission line solutions across Alanya, Gazipaşa, and Manavgat.

MV/HV Transformer Substation Installation & Assembly Transformer Systems

MV/HV Transformer Substation Installation & Assembly

Turnkey concrete kiosk and pole-mounted transformer substation installation from 50 kVA to 2500 kVA for hotels, factories, cold storage facilities, and residential complexes in Alanya.

  • TEDAŞ & Utility Approved Design
  • 50 kVA - 2500 kVA Power Capacity
  • Hermetic & Dry-Type Transformers
  • Turnkey Commissioning & Acceptance
24/7 Transformer Maintenance, Testing & Emergency Fault Service Transformer Systems

24/7 Transformer Maintenance, Testing & Emergency Fault Service

Thermal imaging inspection, transformer oil dielectric testing, MV switchgear maintenance, and 24/7 emergency transformer fault repair across Alanya.

  • 24/7 Mobile Emergency Vehicle
  • Thermal Imaging & Oil Testing
  • Preventive Periodic Maintenance
  • Genuine Spare Parts Warranty
Turnkey Solar Power Plant (SPP) Installation Solar Energy (SPP)

Turnkey Solar Power Plant (SPP) Installation

High-efficiency On-Grid, Off-Grid, and Hybrid Solar Power Plant projects for hotel rooftops, factories, villas, and land plots in Alanya with 300+ sunny days a year.

  • Tier-1 25-Year Warranted Panels
  • Grid Connection & Net Metering
  • Hotel, Factory & Land Solar SPP
  • 24/7 Remote Mobile Monitoring
Power Transmission Lines (ENH) & Underground Cable Works Power Transmission Lines

Power Transmission Lines (ENH) & Underground Cable Works

High/Medium Voltage overhead power transmission lines, galvanized steel lattice tower erection, conductor stringing, and 36 kV XLPE underground cable installation.

  • Overhead Line & Tower Erection
  • 36 kV XLPE Underground Cable
  • Galvanized Steel & Concrete Poles
  • Certified Cable Termination & Splicing
High Voltage (HV) Operating Responsibility & Consultancy Engineering & Consultancy

High Voltage (HV) Operating Responsibility & Consultancy

Chamber of Electrical Engineers (EMO) certified annual High Voltage Operating Responsibility, earthing reports, and energy consultancy for private substation owners.

  • Official EMO Certified Contract
  • Monthly Periodic Site Audits
  • Reactive Penalty Protection
  • Authorized Electrical Engineering
Agricultural Irrigation Solar & Transformer Package Solutions Solar Energy (SPP)

Agricultural Irrigation Solar & Transformer Package Solutions

Deep-well submersible pump solar drive systems and dedicated agricultural irrigation transformer installations for banana, avocado, and citrus plantations in Alanya.

  • Tailored for Banana & Avocado Farms
  • Zero Electricity Bill Operation
  • Deep-Well MPPT Solar Pump Drive
  • Grant & Bank Loan Compliant
Frequently Asked Questions

Common Questions About Transformers & Solar SPP

Alanya'da özel trafo kurulumu ne kadar sürer ve hangi izinler gerekir?

Trafo merkezi kurulum süresi, enerji müsaadesinin Akdeniz EDAŞ'tan alınması, proje onayı ve saha montajı dahil ortalama 30 ile 60 gün arasındadır. Ayazlar Enerji olarak enerji müsaadesi başvurusundan TEDAŞ/EDAŞ geçici kabulüne kadar tüm bürokratik ve mühendislik süreçleri anahtar teslim yürütüyoruz.

Güneş enerjisi (Solar GES) yatırımı Alanya'da kendini kaç yılda amorti eder?

Alanya yıllık 3.000 saati aşan güneşlenme süresiyle Türkiye'nin en verimli solar kuşağındadır. Güncel elektrik tarifeleriyle bir otel, fabrika veya tarımsal sulama GES projesi yatırım maliyetini ortalama 2.8 ile 3.8 yıl arasında tamamen amorti etmekte ve 25+ yıl ücretsiz elektrik üretmektedir.

Gece veya hafta sonu trafo arızası yaşandığında acil servisiniz var mı?

Evet. Ayazlar Enerji bünyesinde 7/24 görev yapan tam donanımlı Mobil OG/YG Trafo Arıza Müdahale ekibimiz bulunmaktadır. Alanya merkez, Mahmutlar, Konaklı, Avsallar, Okurcalar ve Gazipaşa bölgelerine en kısa sürede ulaşarak kesici, sigorta, başlık muf veya trafo arızalarını gideriyoruz.

Yüksek Gerilim (YG) İşletme Sorumluluğu neden zorunludur?

154 kV ve 31.5 kV gibi orta/yüksek gerilimden beslenen özel trafolu tüm tesislerde can ve mal güvenliğini sağlamak, arızaları önceden tespit etmek amacıyla EMO onaylı SMM Elektrik Mühendisi bulundurulması veya dışarıdan YG İşletme Sorumluluğu hizmeti alınması Enerji Bakanlığı yönetmeliğince zorunludur.

Muz serası ve avokado bahçeleri için şebekesiz solar sulama yapılabilir mi?

Kesinlikle. Şebeke elektriğinin olmadığı veya trafo mesafesinin çok uzak olduğu yayla ve tarım arazilerinde, MPPT Solar Pompa Sürücüleri ve monokristal güneş panelleri kurarak derin kuyu dalgıç pompalarınızı doğrudan güneş enerjisiyle sıfır fatura ile çalıştırıyoruz.